CSUMA Eastern Hillside
The Eastern Hillside Stabilization Project would stabilize and reinforce the Cal Maritime campus’s eastern hillside. The project would remediate rockfall and landside risks along the campus’s eastern hillside. Primary project activities include rock excavation, vegetation and tree removal, and construction of rockfall catchment infrastructure at the toe of the hillside which includes a flat concrete debris/maintenance bench and 6-foot-high retaining wall with a 6-foot-high debris barrier installed on top of the wall. This infrastructure would minimize damage from future landslides or rockfalls below the hillside.